Piling mat

A prepared, compacted working platform so piling rigs can mobilise and work safely.

Phase 01 · Site enabling & prep

A piling mat is the working platform a piling rig stands on. It spreads the rig’s load, gives safe access across the working area and is built to the agreed design for the equipment being used.

Civio prepares the formation, places and compacts the mat material and hands over a clear platform for the piling contractor. Once piling is complete we carry on with the reinstatement and the groundworks that follow, such as pile caps and ground beams.

What’s included

  • Review of the platform area, levels and access
  • Clearing and trimming the formation
  • Placing and compacting mat material to the agreed design
  • Access routes for the piling rig
  • Handover of a clear platform to the piling contractor
  • Reinstatement once piling is complete
Sectors
Residential, commercial, education and healthcare
Area
London and the South East
Taken as
On its own or within the full package

How we deliver it

One Civio team from first survey to handover.

  1. 01

    Ground review

    We review the platform area, levels, access and available site information before the work is planned.

  2. 02

    Formation preparation

    The working area is cleared, trimmed and prepared to receive the specified mat material.

  3. 03

    Material placement

    Suitable material is placed and compacted in line with the agreed design and site requirements.

  4. 04

    Handover for piling

    We leave a clear platform ready for the piling contractor to mobilise.

Common questions

What is a piling mat?

A prepared working platform that supports piling equipment and site access during piling operations.

What do you need to plan a piling mat?

The platform design or rig details, the extent of the working area, existing levels and ground information, and the piling programme.

Can you carry out the groundworks after piling?

Yes. At Park Hill School we provided piling attendance and then built the pile caps and ground beams for the new modular classrooms.