Surfacing

Asphalt and hard surfacing for car parks, access roads and footways, built up from a properly prepared base.

Phase 04 · Surfacing & handover

The right surface depends on how the area will be used, the sub-base, levels, drainage and the edges it meets. Civio plans surfacing around all of these, from the formation through to the finished layer.

Surfacing is the fourth phase of our package, so it ties in with the drainage, kerbs and paving we have already built. We have laid asphalt car parks at East Tilbury School, Park Hill School and Bard Pharmaceuticals.

What’s included

  • Review of use, levels, drainage and connections
  • Formation and sub-base preparation
  • Kerbs and edging
  • Asphalt and hard surfacing
  • Car parks, access roads and footways
  • Coordination with drainage, paving and landscaping
Sectors
Residential, commercial, education and healthcare
Area
London and the South East
Taken as
On its own or within the full package

How we deliver it

One Civio team from first survey to handover.

  1. 01

    Area review

    We review the intended use, existing levels, drainage and connection points.

  2. 02

    Base preparation

    The formation and sub-base are prepared to the agreed surfacing build-up.

  3. 03

    Edge and surface installation

    Kerbs, edging and the chosen surface are installed to the planned layout and finish.

  4. 04

    Completion

    We complete the surface and hand the area over, or coordinate it with the remaining external works.

Common questions

What surfaces do you lay?

Asphalt car parks, access roads and footways, with kerbs and edging. We will recommend a build-up to suit how the area will be used.

What preparation is needed before surfacing?

The formation and sub-base have to be prepared to the agreed build-up, with levels and drainage set before the surface goes down.

Can surfacing be part of the full package?

Yes. At East Tilbury School and Park Hill School we built the car parks, kerbs and footpaths after completing the foundations and drainage.

Request a price

Send drawings, a bill of quantities or a two-line description. Civio prices this service on its own or as part of the full groundworks package.