Piling services

Piling attendance and the groundworks around it, sequenced so the build keeps moving.

Phase 02 · Foundations & substructure

Piling is used where the structural design needs loads taken down to stronger ground. Civio supports the piling operation on site: preparing access and working areas, attending the rig and building the pile caps and ground beams that follow.

Because piling is one stage in a longer sequence, we plan it with the piling mat, excavation, drainage and reinstatement around it. At Park Hill School this meant piling attendance, pile caps and ground beams within a 20-week package.

What’s included

  • Review of piling information, site constraints and sequence
  • Piling mat and access preparation
  • Piling attendance during the works
  • Coordination with the piling contractor and design team
  • Pile caps and ground beams
  • Reinstatement and follow-on groundworks
Sectors
Residential, commercial, education and healthcare
Area
London and the South East
Taken as
On its own or within the full package

How we deliver it

One Civio team from first survey to handover.

  1. 01

    Review the requirements

    We review the piling information, site constraints and proposed construction sequence.

  2. 02

    Prepare the site

    Access, working areas and supporting groundworks are prepared around the agreed scope.

  3. 03

    Coordinate the works

    We work with the piling contractor and project team to support the planned piling operation.

  4. 04

    Support the next stage

    After piling we build the pile caps, ground beams and surrounding groundworks for the build.

Common questions

When is piling needed?

Where the structural design requires loads to be transferred through weaker ground near the surface to supporting strata below.

Who installs the piles?

Piles are installed by a specialist piling contractor. Civio prepares the site, attends the rig and carries out the groundworks before and after, so one contractor manages the sequence around the piling.

What should be in place before piling starts?

Design information, site investigation, a suitable working platform, access for the rig and an agreed sequence for the work that follows.

Request a price

Send drawings, a bill of quantities or a two-line description. Civio prices this service on its own or as part of the full groundworks package.