CHAS accredited · 100% CSCS workforce · London and the South East
124 Queens Road, Walthamstow E17 8QP
A £1 million groundworks package in Walthamstow, including an ACO Qmax 900 drainage system.
Civio carried out the enabling works and concrete pad foundations, installed an ACO Qmax 900 drainage system, and finished the site with footpath paving and surfacing.